Email: info@aotumold.comTel / WhatsApp: +86 135 7080 2169
中文WhatsApp: +86 135 7080 2169

Request a Quote

REQUEST A QUOTE

What to send us for a fast, accurate quotation

The more of the list below you can supply, the more useful our first reply is — but a 3D drawing alone is enough to start.

ItemWhat helps us quote accurately
3D drawingSTEP / IGES / UG / STP preferred. Any format we can open is fine.
Material or gradeIf you already know it (e.g. Victrex 450G), say so. If not, describe the duty and we will recommend.
Part size and wall thicknessOverall dimensions and the thinnest wall are the two figures that drive tooling cost most.
Annual volume and first orderDetermines whether rapid tooling or production steel is the right answer.
Critical dimensions and tolerancesWhich features must hold, and to what tolerance.
Application conditionsService temperature, chemical exposure, sterilization, regulatory requirements.
Target dateSo we can tell you honestly whether the timeline is achievable.
HOW TO REACH US

Two ways, both answered within 48 hours

Email

info@aotumold.com

Send the drawing as an attachment with your quantity and target date. Best for full project briefs and documentation.

WhatsApp / WeChat

WhatsApp / Tel: +86 135 7080 2169
WeChat: AOTUMUJU_2008

Fastest for a quick feasibility opinion or to send a drawing straight from your phone.

Open the full inquiry form
WHAT HAPPENS NEXT

From drawing to quotation

1. Review

We read the drawing, check feasibility and flag anything that will affect cost or tool life.

2. DFM

Draft, wall thickness, gating and ejection review — with risk points called out.

3. Moldflow

Fill, pack and warpage assessment, plus the shrinkage compensation plan.

4. Quotation

Price with a breakdown of what drives it, cycle estimate and lead time. Within 48 hours.

Have a 3D drawing? DFM feedback and quotation in 48 hours.

Send STEP / UG / STP files by email or WeChat — you get material analysis, gating proposal, cycle estimate and mold price in one reply.

Request a Quote
  • Specialty engineering plastics only — PEEK, PEI, PPS, PPSU, PSU, PES, LCP
  • Barrel 360–400 °C, mold 160–220 °C — built for PEEK's 343 °C melt
  • Rapid tooling delivers first samples in 7–15 days, 1–5,000 pcs
  • Moldflow first, first-article FAI report, key dimensions CPK ≥ 1.33